Pipe Squeeze -- Series
Content
Pipe Squeeze
Available in
days
days
after you enroll
-
StartIntroduction to Pipe Squeeze (1:00)
-
StartWhat kind of tools do you need? (1:22)
-
StartInspect your pipe. What size of gap stops are required for polyethylene pipe squeezing? (0:26)
-
StartWhat is the correct distance to place any squeezer from a joint or another squeezer? (0:26)
-
StartWhen grounding at a squeeze location, is there a required distance a ground rod must be away from the squeeze location? (0:42)
-
StartHow do you install the squeezer? (0:44)
-
StartWhat is the appropriate rate of squeeze? (0:46)
-
StartWhy is it so important to tag your squeeze tool? (0:36)
-
StartWhat is the correct symbol for a location that has already been squeezed? (0:19)
-
StartIs the procedure the same for squeezing a smaller CTS pipe? (1:09)
-
StartWhat is the rate of release? (0:55)
-
StartWrap up (0:55)
Quiz
Available in
days
days
after you enroll
Your Instructor
John has over 20 years’ experience working in natural gas pipeline transmission and distribution across the United States. Today he is recognized as an expert in natural gas integrity management training by utility operators and contractors alike. He has conducted 3,686 evaluations and has developed and managed programs that have trained thousands of pipeline crew members nationwide.